简要介绍了钢筋混凝土框架梁柱节点加腋梁施工技术的工艺原理,并从钢筋混凝土梁节点与柱节点钢筋设计两方面对其工艺流程进行了阐述,解决了型钢梁与钢筋混凝土框架梁柱交叉节点部位的钢筋穿越问题。
This paper briefly introduced the process principle of haunched beam construction technology of reinforcement concrete beam-column joints,and elaborated the process from reinforcement concrete beams joints and columns joints reinforcement design two aspects,solved the reinforcement crossing problem of structural steel beam and reinforcement concrete frame beam-column cross node positions.
出处
《山西建筑》
2013年第24期117-118,共2页
Shanxi Architecture
关键词
钢筋
框架梁柱节点
混凝土
reinforcement
frame beam-column joint
concrete