摘要
对造成公路工程超概的原因进行了分析,并对传统调整法、结算式调整法、指数调整法三种公路工程调整概算的方法进行了探讨,指出指数调整法操作简单、可最大限度地达到节约投资、规范资金使用的目标。
The paper analyzes the reasons for the issue exceeding estimation of road projects,explores the methods of adjusting estimates on road projects,including the traditional adjustment method,the settlement adjustment and index adjustment method,and points out the index adjustment method featured with the easy operation can save investment maximally and regulate the use of assets.