摘要
介绍了工程量清单计价模式下招投标作用机制的实现方式,并分析了工程量清单计价模式对投标报价工作的影响因素,以期为工程量清单计价作用的发挥创造出良好的发展空间,全面提升工程量清单计价的科学性和合理性。
This paper introduced the implementation ways of bidding role mechanism under the engineering quantity list valuation mode,analyzed the influence factors of engineering quantity list valuation mode to bidding quotation work,in order to create good development space to the play the role of engineering quantity list valuation,comprehensively enhanced the science and rationality of engineering quantity list valuation.
出处
《山西建筑》
2013年第24期244-245,共2页
Shanxi Architecture
关键词
工程量清单计价
建筑工程
招投标
作用
engineering quantity list valuation
construction project
bidding
role