摘要
建设项目竣工环保验收监测中常常出现建设同环评和初步设计不相符、变更粉尘产污环节、环评文本遗漏重要敏感点评价、数据异常、工况条件不满足要求等问题,基于此提出了重新报批变更的工程内容,向环保主管部门说明变更情况,对遗漏部分进行补充评价并监测,对异常数据查明原因后科学剔除,以及按照实际工况进行监测等应对措施。
Environmental protection acceptance monitoring of construction with the environmental impact assessment and preliminary design does not match, the change of dust pollution links, the EIA text missing important sensitive point evaluation, abnormal data, working conditions do not meet the requirements, problems often arise for construction project, based on the change of the contents of the project re-planning is proposed, that changes to the environmental protection de-partments, supplement evaluation and monitoring of the missing part of the abnormal data, identify the cause of science removed, and in accordance with the actual conditions of monitoring mea-sures.
出处
《中国环境管理干部学院学报》
CAS
2013年第4期68-70,共3页
Journal of Environmental Management College of China
关键词
建设项目
验收监测
环评文件
工程
评价
数据
工况
construction project
acceptance monitoring
EIA documents
engineering
evaluation
data
working condition