摘要 根据风力发电机组型式认证及试验相关要求,介绍了一种应用风力发电机组载荷测试方法对仿真设计进行验证的实例。结合实际测试的外部条件,如风速、风向、温度、气压等以及风力发电机组本身的电气模型,运用BLADED软件进行计算与仿真,得到启机、正常停机、脱网、超速等不同工况下的载荷仿真结果。通过仿真结果与测试结果的对比,验证风力发电机组的设计载荷。同时,通过比较20年疲劳载荷谱,可以对风力发电机组的使用寿命与安全性进行确认,该研究对于优化风力发电机组的载荷设计具有重要意义。 According to the requirements of the wind turbine protest type certification, this article in- troduces an example of the load validation based on wind turbine load measurement. After measure- ment, with the measured real outside conditions, such as wind speed, wind direction, temperature, air pressure, and also the electro-geometric model of the wind turbine itself, the BLADED software is used to do the load simulation and calculation. Through the simulation, we can get the simulation re- suits of different load cases, such as wind turbine start-up, normal shut-down, grid failure, over speed and so on. By this way, comparing the simulation results and the measurement results, the wind turbine design load could be validated. Through the fatigue results comparison, the design life and safety of the wind turbine can be verified simultaneously. It makes significant sense to the wind turbine load design optimization.
出处 《可再生能源》 CAS 北大核心 2013年第8期38-40,44,共4页 Renewable Energy Resources
基金 国家能源局应用技术研究及工程示范项目(NY20110404-1)
关键词 型式认证 载荷测试 载荷比对 疲劳 protest type certification load measurement load comparison fatigue
  • 相关文献

参考文献5

  • 1薛扬,付德义,焦渤,等.一种符合IEC61400—13标准的风电机组载荷测试系统[P].中国专利:201010513594,2011-02—16.
  • 2IEC 61400-1-2005, Wind turbines partl: design re- quirements [S].
  • 3IEC 61400-13-2001, Wind turbines generator sys- tems-part 13 : measurement of mechanical loads[S].
  • 4IEC 61400-12-1-2005, Wind turbines part 12-1: power performance measurements of electricity produc- ing wind turbines[S].
  • 5付德义,薛扬,秦世耀.MW级风力发电机组载荷测试方法研究[J].可再生能源,2013,31(3):65-68. 被引量:17

二级参考文献7

  • 1中国可再生能源学会风能专业委员会.2010年中国风电产业发展现状[J].风能,2010(2):40.
  • 2IEC 61400-1-2005,Wind turbines Part1: Design re- quirements[S].
  • 3IEC 61400-13-2001 ,Wind turbines generator systems- Part 13: Measurement of mechanical loads[S].
  • 4IEC 61400-12-1-2005, Wind turbines Part 12-1: Power performance measurements of electricity produc- ing wind turbines[S].
  • 5IEC 61400-22-2010, Wind turbines Part 22: Confor- mity testing and certification [S].
  • 6IEC TS 61400-23-2010, Wind turbines generator sys- tems- Part 23: Full scale structural testing of rotor blades [S].
  • 7魏玉通,田德,王海宽,王丽丽,许明,董正茂.风力发电机叶片动态载荷分析[J].农村牧区机械化,2009(1):17-20. 被引量:5

共引文献16

同被引文献103

引证文献13

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部