摘要
本文主要根据福厦线的福清车站及其配套建筑的工程分析与实践总结,针对该工程的各项要求以及施工条件,分析了我国铁路车站以及配套建筑的工程在施工过程中可能存在的技术难点,并给出相应的建议。
In this paper, according to Fuqing railway station in Fuxia Line and its supporting construction of engineering analysis and practice summary, according to the requirements of the engineering and construction conditions, the author analyses the technical difficulties of China railway station and supporting the construction project may exist in the process of construction, and puts forward some corresponding suggestions.
出处
《城市建筑》
2013年第2期75-76,共2页
Urbanism and Architecture
关键词
铁路车站
配套建筑
工程技术
railway station
supporting construction
engineering and technology