碾压混凝土大坝工程快速施工的技术分析 被引量:1

Analysis the Rapid Construction Technology of Roller Compacted Concrete Dam Project
下载PDF
导出
摘要 碾压混泥土的施工具有强度高、连续、快速三大特点,这些特点从根本上保证了层间结合质量。本文将从碾压混凝土的施工优化、高温情况下碾压混凝土连续施工以及施工条件这三大方面讲述对碾压混凝土实施快速施工的方法,并依靠完善的管理体系以及全套碾压混凝土来确保混凝土的施工强度达标。 The construction of roller compacted concrete has high strength, continuous, fast three characteristics construction roller compacted concrete, these features from the fundamental guarantee for the quality of the interlayer bonding. This article will talk about the roller compacted concrete construction optimization, under the condition of high temperature roller compacted concrete continuous construction and construction conditions of the three aspects of the implementation method for rapid construction of roller compacted concrete, and rely on the perfect management system and a full set of roller compacted concrete to ensure the construction of concrete strength.
出处 《城市建筑》 2013年第2期92-93,共2页 Urbanism and Architecture
关键词 碾压混凝土 大坝工程 快速施工 roller compacted concrete dam engineering rapid construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部