期刊文献+

建筑工程施工阶段进度管理目标的分解与规划

Decomposition and Planning of the Construction Phase of the Construction Work Progress Management Objectives
下载PDF
导出
摘要 建筑工程施工阶段的进度管理,是工程管理工作的重要内容之一。通过科学管理施工阶段进度,可以确保工程在质量过关、功能齐全、成本节约的情况下,按时或者提前于工程工期完成工程任务。这对于工程投资方来说,除了可以提前将工程交付,还能够在一定程度上减少施工成本。关于进度管理目标的分解规划,可以在确定竣工时间的基础上,通过对施工阶段进度总目标进行详细分解,并科学地规划,以此促进总目标的顺利实现,这也正是本文的研究重点所在。 The progress management of construction engineering is one of the important contents of project management work. The progress of scientific management in construction stage, it can assure project in quality, complete function, cost savings and circumstances, on time or prior to the project completion of Engineering tasks. The project investment side, in addition to the project will be paid in advance, but also can reduce the construction cost to a certain extent. Decomposition of planing on the schedule management target, can be based on determining the completion time, the total target schedule construction phase decomposition in detail, and the scientific planing, the smooth realization of the overall goal to promote, this is also the focus of this study.
作者 岳萌
出处 《城市建筑》 2013年第2期133-133,共1页 Urbanism and Architecture
关键词 建筑工程 施工阶段 进度管理 construction phase construction schedule management
  • 相关文献

参考文献3

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部