2KANG Y H,KIM S S, SHIN H J. A dispatching algorithm for parallel machines with rework processes [ J ]. The Journal of the Operational Research Society, 2009,61 ( 1 ) : 144-155.
3Buyukozkan G, Baykasoglu A, Dereli T. Integration of Internet and web-based tools in new product development process [ J ]. Production Planning and Control ,2007,18 ( 1 ) :44-53.
4WU S H,FUH J Y H, NEEA Y C. Concurrent process planning and scheduling in distributed virtual manufacturing [ J ]. IIE Transactions, 2002,34 : 77-89.
5ABD R A R, MOHD S N B . The need for a new product development framework for engineer-to-order products [ J ]. European Journal of Innovation Management,2003,6 (3) : 182-196.
6WU R C, CHEN R S , FAN C R. Design an intelligent CIM system based on data mining technology for new manufacturing processes [ J ]. International Journal of Materials and Product Technology, 2004,21 (6) :487 -504.