期刊文献+

Tension leg platform project execution 被引量:5

Tension leg platform project execution
下载PDF
导出
摘要 The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Project execution is always a challenge for floating system. This paper focuses on the critical elements of project execution for tension leg platform,and studies potential implications to future oil and gas exploration in South China Sea. There are many factors affecting successful execution of floating system project,including technical issues, engineering management,interface management,etc. There are also failure examples of project execution in the industry. The author has participated 28 large detailed projects and has gained extensive experience on floating projects,with ample hands-on project experiences. A detailed tension leg platform project study example and discussions in depth are presented for future project execution in China deepwater development.
出处 《Engineering Sciences》 EI 2013年第4期79-85,共7页 中国工程科学(英文版)
关键词 project execution deepwater project tension leg platform floating system project management 张力腿平台 浮动平台 中国南海 天然气勘探 多因素影响 工作经历 概念设计 生产平台
  • 相关文献

参考文献7

  • 1Luyties W H. Na Kika-Noval development in record water depth [C]//Offshore Technology Conference, Houston, Texas, USA, Paper No. 16698, 2004: 1-9.
  • 2Rainey R. Brutus project overview: Challenges and results [C]// Offshore Technology Conference, Houston, Texas, USA, Paper No. 13990, 2002: 1-10.
  • 3Sandstr R J, Huang J, Danaczko M. Development of close- moored deepwater systems: Kizomba A and B projects [C]//Off- shore Technology Conference, Houston, Texas, USA, Paper No. 17919, 2006: 1-5.
  • 4Wetch S, Wybro E West Seno facilities approach, innovations and benchmarking [C]//Offshore Technology Conference, Hous- ton, Texas, USA, Paper No. 16521, 2004: 1-12.
  • 5Zimmer R. Design and fabrication of the URSA TLP deck mod- ules and TLP hull upper column frame [C]//Offshore Technology Conference, Houston, Texas, USA, Paper No. 10755, 1999: 1-11.
  • 6Zhang Dagang, Deng Zhangchao, Yan Fasuo. An introduction to hull design practices for deepwater floating structures [J]. Journal of Marine Science and Application, 2009:123-131.
  • 7Zhang Dagang. Application of tension leg platform combined with other systems in the development of China deepwater oil fields [J]. Journal of China Offshore Engineering, 2007, SCI: 000242,916300001.

同被引文献10

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部