摘要
2013年,上海LNG项目已进入达产期,LNG交付模式采取离岸价(FOB)与到岸价(DES)混合交付模式。分析混合交付模式下面临的问题及提高经济性的措施。
The Shanghai LNG project has entered production phase since 2013, and LNG delivery mode uses FOB and DES mixed mode. The problems faced by the mixed delivery mode and the measures for improving the economy are analyzed.
出处
《煤气与热力》
2013年第8期6-7,共2页
Gas & Heat
关键词
到岸价
离岸价
LNG船运
LNG混合交付模式
船期
delivered ex ship (DES)
free on board (FOB)
LNG shipping
LNG mixed delivery mode
sailing schedule