浅淡厦门市建筑工程竣工规划条件核实测量 被引量:3

The Planning Conditions to Verify Survey of Building Engineering As-built in Xiamen
下载PDF
导出
摘要 随着厦门市房地产投资项目不断增加,测绘成果要求现势性强、精度高,竣工规划条件核实测量客观、准确地反映建设工程实际情况。本文介绍厦门市建筑工程竣工规划条件核实测量的流程,通过图根控制测量,数字化测图,1:500数据线划地图编绘,建筑高度测算,建筑外观照片,建筑面积测算最后进行检查与验收,探索测量过程中的注意事项。 Increasing by Xiamen real estate investment projects, the results of surveying and mapping require uptodate and high precision, the as--built planning conditions to verify the survey objective and accurate reflection of the actual situa tion of the construction project. The paper introduces the process of planning conditions to verify survey of building engi- neering as--built in Xiamen, requirements Figure control surveying, digital mapping, 1 : 500 Data Line Map Compila- tion, building height calculation, building exterior photos, construction area estimating and finally inspection and accept- ance, discover the precautions in the measurement process.
作者 林代垚
出处 《北京测绘》 2013年第4期94-96,共3页 Beijing Surveying and Mapping
关键词 建筑工程 图根控制 数字化测图 construction project figure control digital mapping
  • 相关文献

参考文献5

  • 1包民先,高玉良,陆建雄.提高RTK平面控制测量精度与可靠性试验研究[J].北京测绘,2010,24(4):65-67. 被引量:11
  • 2北京市测绘设计研究院.CJJ8-99城市测量规范[S].北京:中国建筑工业出版社,1999.
  • 3国家质量技术监督局.GB/7929-2007.1:500、1:1000、1:2000地形图图式[S].北京:中国标准出版社,2007.
  • 4国家质量技术监督局.GB/T 17986-2000.房产测量规范[S].北京:中国标准出版社,2002.
  • 5厦国土房[2012] 375号通知.厦门市房产面积测算细则(2011年版)[EB/OL] ,厦门:厦门市国土资源与房产管理局,2011.

二级参考文献4

共引文献36

同被引文献9

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部