摘要
随着厦门市房地产投资项目不断增加,测绘成果要求现势性强、精度高,竣工规划条件核实测量客观、准确地反映建设工程实际情况。本文介绍厦门市建筑工程竣工规划条件核实测量的流程,通过图根控制测量,数字化测图,1:500数据线划地图编绘,建筑高度测算,建筑外观照片,建筑面积测算最后进行检查与验收,探索测量过程中的注意事项。
Increasing by Xiamen real estate investment projects, the results of surveying and mapping require uptodate and high precision, the as--built planning conditions to verify the survey objective and accurate reflection of the actual situa tion of the construction project. The paper introduces the process of planning conditions to verify survey of building engi- neering as--built in Xiamen, requirements Figure control surveying, digital mapping, 1 : 500 Data Line Map Compila- tion, building height calculation, building exterior photos, construction area estimating and finally inspection and accept- ance, discover the precautions in the measurement process.
出处
《北京测绘》
2013年第4期94-96,共3页
Beijing Surveying and Mapping
关键词
建筑工程
图根控制
数字化测图
construction project
figure control
digital mapping