摘要
本文通过董洼水库工程地质条件的分析,大坝采用多头小直径防渗墙垂直防渗措施,并结合工程竣工检测数据和运行效果,对董洼水库大坝防渗效果进行综合评价。
This paper makes a clear analysis on DongWa reservior project' s geology conditions. Then the large dam adopts imperviors wall of multipoint and small diameter measures, for vertically seepage - proofing. Then the final detection data of construction and working effect are collected to make a comprehensive evaluation of the seepage prevention effect of DongWa Reservior's large dam.
出处
《安徽科技学院学报》
2013年第4期33-36,共4页
Journal of Anhui Science and Technology University
关键词
地质条件
多头小直径防渗墙
渗透系数
水泥土抗压强度
运行效果
Geology conditions
The multiple small diameter cut - off wall
Coefficient of permeability
The compression strength of cement
Working effect