期刊文献+

欠平衡钻井地层出气量对环空压力影响分析 被引量:1

The Analysis of Effect of Gas Volume on Annulus Pressure in UBD
下载PDF
导出
摘要 采用欠平衡钻井技术钻遇裂缝、溶洞或高气油比油气藏时,地层气体会在重力置换作用和压差作用下进入井筒,对环空压力剖面产生影响。出气量不同对环空压力的影响不同。建立了环空气液两相流动模型并采用Mathcad编制程序求解模型、实例分析了出气量对流型、环空含气率、密度及环空压力的影响。分析结果表明:环空不同井段流态不同,随着出气量的增加,环空依次会出现搅动流和环雾流,对携岩不利;随着出气量的增大,环空含气率增大,密度减小,且出气量对含气率和密度的影响程度井口比井底大得多;井底压力随出气量基本呈线性规律变化。 When drilling fracture-cave or high GOR reservoir by UBD,reservoir gas will enter into wellbore under the action of gravity displacement and drawdown,and this process will exert impact on annulus pressure profile.Different gas volume has different effect on annulus pressure.Gas-liquid two-phase flow model is built and programs are made to solve this model by using Mathcad.The effect of gas volume on flow pattern,annulus gas holdup,density and pressure is analyzed by example.Analysis results show that churn flow and ring-mist flow emerge as gas volume increases,this will have adverse effects on cutting carrying.As gas volume increases,gas holdup increase and mixture density decrease,the effect of gas volume on gas holdup and density in wellhead is much severe than it in bottom hole.Bottom hole pressure changes linearly with gas volume.
出处 《科学技术与工程》 北大核心 2013年第22期6421-6425,共5页 Science Technology and Engineering
基金 国家科技重大专项课题(2011ZX05022-005)资助
关键词 欠平衡钻井 出气量 两相流 流态 环空压力 UBD gas production two-phase flow flow pattern annulus pressure
  • 相关文献

参考文献8

二级参考文献33

  • 1刘刚,朱忠喜,张迎进,戴爱国.空气钻井中的压力及注气量问题研究[J].钻采工艺,2005,28(2):4-6. 被引量:19
  • 2周英操,刘永贵,鹿志文.欠平衡钻井井底压力控制技术[J].石油钻采工艺,2007,29(2):13-17. 被引量:26
  • 3严新新,陈永明,燕修良.MPD技术及其在钻井中的应用[J].天然气勘探与开发,2007,30(2):62-66. 被引量:62
  • 4SVEIN Syltφ, SVEIN Erik Eide, STEINAR Torvund. Highly advanced multitechnical MPD concept extends achievable HTHP targets in the North Sea [R] . SPE/IADC 114 484, 2008.
  • 5MEDLEY GEORGE H, DENNIS Moore, SAGAR Nauduri, et al. Simplifying MPD: lessons learned [ R ]. SPE/IADC 113 689, 2008.
  • 6SILVANG S A, LEUCHTENBERG C, GILI C, et al. Managed pressure drilling resolves pressure depletion related problems in the development of the HTHP Kristin Field [ R]. IADC/SPE 113 672, 2008.
  • 7BJΦRKEVOLL Knut S, MOLDE Dag Ove, ROMMETVEIT Rolv, et al. MPD operation solved drilling challenges in a severely depleted HP/HT reservoir. IADC/SPE 112 739, 2008.
  • 8OLVE S, SIGBJON S. Evaluation of MPD methods for compensation of surge-and -swab pressure in floating drilling operations [R] . SPE/IADC 108 346, 2007.
  • 9DON M, HANNEGAN P E. Managed pressure drilling in marine environments-case studies [ R ] . SPE/IADC 92 600, 2005.
  • 10HANNEGAN D, FISHER K. Managed pressure drilling in marine environments [ R ] . IPTC 10 173, 2005.

共引文献54

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部