摘要
在各类施工放样中比较常见的放样技术是全站仪和RTK,但是单一的全站仪放样方法或RTK放样方法常常因为地形复杂的原因无法快速和精确地达到放样要求。本文通过综合分析两类放样技术,结合某施工项目的实例介绍了RTK结合全站仪在施工放样中的应用。
The total station and RTK are the most common technology in the setting out of construction,but the single technology of setting out which is surveyed by total station or RTK can’t support quick and accurate requirements for layout because of the complex terrain.Through comprehensive analysis of two kinds of layout techniques and combining an instance of construction project,this paper describes the application of RTK combined by the total station in setting out.
出处
《测绘与空间地理信息》
2013年第8期256-257,共2页
Geomatics & Spatial Information Technology
关键词
全站仪
RTK
放样
精度
total station
RTK
setting out
accuracy