大口井排水法在送电线路工程中的应用

Application of large open well dewatering method in power transmission line engineering
下载PDF
导出
摘要 以滦河电厂-周营子220 kV双回线路工程G40铁塔基础施工为例,介绍了大口井排水法的施工过程并进行了计算验证,对大口井排水法和传统的井点施工法进行了比较,指出了大口井排水法的优点。 Taking G40 iron tower foundation construction of Luanhe Power Plant-Zhouyingzi Substation 220 kV double circuit line as example,the construction process of large open well dewatering method was introduced,and relevant calculation verification was given.The large open well dewatering construction method was compared with the traditional well point construction method,and the advantages of the large open well dewatering construction method were pointed out.
机构地区 北京送变电公司
出处 《华电技术》 CAS 2013年第7期26-28,77,共3页 HUADIAN TECHNOLOGY
关键词 送电线路工程 塔基施工 大口井排水法 井点施工法 工程应用 power transmission line engineering tower foundation construction large open well dewatering method well point dewatering construction method engineering application
  • 相关文献

参考文献9

二级参考文献3

  • 1[2]SL/T246-1999,灌溉与排水工程技术管理规程[S].
  • 2GB 50288-99 灌溉与排水工程设计规范.
  • 3SL 310-2004.村镇供水工程技术规范[S],2004.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部