大型发电机出口断路器事故分析和处理 被引量:3

Analysis and Treatment on Circuit Breaker Fault at Generator Outlet
原文传递
导出
摘要 印度卡玛朗加电厂1号机组(350MW)在启动调试阶段进行同期并网时,发电机出口发生两相短路事故。基于保护装置的故障录波图、微机事件报文和发生事故时的信息,分析事故原因;将更换断路器后进行的主变压器检测试验、发电机断路器特性试验、发电机短路和空载特性试验、机组带负荷试验(更换发电机断路器后进行)的结果,与事故前检测试验数据比较,确认事故后主变压器、发电机的安全性、可靠性没有改变,可以投入运行;针对此次事故暴露的问题提出反事故措施。 During the start-up commissioning of No. 1 unit (350 MW) in India Kamalanga Power Plant, two-phase short-circuit fault occurred at generator outlet during the process of synchronization. The fault causes were analyzed based on fault records, computer messages and other fault information. After the replacement of circuit breaker, the detection test for main transformer, the circuit breaker performance test, short circuit and open circuit performance test for generator, as well as the load test for units were carried out, and the results were compared with the detection test results before fault, in order to confirm that the main transformer and generator could be able to put into operation with the safety and reliability not being changed. Finally, countermeasures were proposed according to the problems exposed in the incident.
出处 《电力建设》 2013年第7期95-99,共5页 Electric Power Construction
关键词 大型发电机 断路器 启动调试 短路事故 large generator circuit breaker start-up commissioning short circuit fault
  • 相关文献

参考文献9

  • 1阚瀛,王崇林.大型电力变压器出口短路故障分析及措施[J].电力建设,2008,29(5):34-36. 被引量:2
  • 2张保全,尹项根.电力系统继电保护[M].北京:中国电力出版社,2010.
  • 3GB50150-2006电气设备安装工程电气设备交接试验标准[S].
  • 4GB/T7252变压器油中溶解气体分析和判断导则[S].
  • 5DL/T911-2004.电力变压器绕组变形的频率响应分析法[S].[S].,..
  • 6中华人民共和国能源部基本建设司.火电厂电气设备起动调试[M].北京:水利电力出版社,1992.
  • 7河南省电力公司.火电工程调试技术手册:电气卷[M].北京:中国电力出版社,2003.
  • 8南京南瑞继保电气有限公司.PCS-985B发电机变压器组保护装置说明书[G].南京:南京南瑞继保电气有限公司,2011.
  • 9田广青.中低压开关柜内部故障电弧光保护系统[J].电工技术,2004(10):62-64. 被引量:7

二级参考文献8

共引文献43

同被引文献22

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部