摘要 为解决锦屏—苏南±800kV渝3标段展放标称截面900mm2导线时出现的导线上扬问题,通过分析上扬机理、模拟试验及现场试验等,找出了克服大截面多分裂导线上扬的新方法,使导线上扬问题得到有效解决。通过受力分析,推导出克服上扬力的计算公式,选择克服导线上扬用工器具。此方法在工程应用中保证了导线施工质量,提高了放线速度,降低了放线不安全因素,取得较好效果。 In order to solve the conductor updip problem during the tension stringing of conductor with 900 mm2 nominal cross section occurred in Chongqing Section 3 of ± 800 kV Jinping-Sunan power transmission project, a new method that could overcome and effectively solve the updip problem of large cross-section bundled conductor has been found, through the analysis on updip mechanism, simulation tests and field tests. Then, through the force analysis, the calculation formula to overcome the updip force was deduced, and the apparatus that could overcome the updip problem were chosen. In the engineering application, this method could achieve good effect in construction, such as ensuring the conductor construction quality, improving the stringing speed, and reducing the unsafe factors of stringing.
出处 《电力建设》 2013年第7期118-121,共4页 Electric Power Construction
关键词 大截面多分裂导线 放线滑车悬挂 导线上扬 张力放线 large cross-section bundled conductor pulley hanging conductor updip tension stringing
  • 相关文献

参考文献9

二级参考文献27

  • 1曹惠潮.不同规格大截面导线混合张力放线施工工艺[J].电力建设,2006,27(7):5-7. 被引量:6
  • 2徐守琦,戚桂成.1000kV特高压输电线路架线施工的探讨[J].电力建设,2007,28(4):11-13. 被引量:16
  • 3国家电网公司.锦屏一苏南±800kV特高压直流线路钢芯铝绞线[s].2008.
  • 4国家电网公司.±800kV架空输电线路张力架线施工工艺导则(报批稿)[s].2008.
  • 5Q/GDW260-2009±800kV架空输电线路张力架线施工工艺导则[S].
  • 6Q/GDW260-2009《800kV架空输电线路张力架线施工工艺导则》.
  • 7李博之.高压架空输电线路施工技术手册(第二版)[M].北京:中国电力出版社,1998..
  • 8DL/T 436-2005,高压直流架空送电线路技术导则[S].
  • 9DL 5009.2-2004,电力建设安全工作规程[S].
  • 10Q/GDW154-2006《1000kV架空输电线路张力架线施工工艺导则》.

共引文献45

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部