摘要
针对目前国内军用软件承制单位的软件二级项目管理问题,提出了一种基于GJB5000A二级软件项目管理的实施方法,阐述了从项目策划到项目监控等环节的执行过程,并总结二级项目管理经验,明确项目管理改进方向,为军用软件承制单位的GJB5000A二级过程的执行和改进提供借鉴.
Aiming at the software project management problems on second level in military software manufacturers, this paper puts forward an implementation method based on software project management in GJB5000A of second maturity level, describes the procedures form project plan to project monitoring and control and other aspects, summarizes the project management experiences and project management improvements, and provides references on implementation and improvement in GJB5000A of second maturity level to military software manufacturers.
出处
《计算机系统应用》
2013年第8期14-17,共4页
Computer Systems & Applications