摘要
详细介绍了监控量测、迈式锚杆、仰拱超前和网络技术等新技术、新方法在朔黄铁路东风隧道施工中的应用情况。实践表明 ,只有采用新技术、新方法 ,才能实现安全、优质。
The application of new technology,new material and new method such as monitoring and measurement,Mei bolt,advanced invert and network plan in the construction of Dongfeng Tunnel on Suzhou Huanghua railway was introduced in detait in this paper.Practice shows that only using the new technology,new material and new method,the tunnel construction can be carried out in safe way,good quality and effectiveness.
出处
《石家庄铁道学院学报》
2000年第B09期12-14,共3页
Journal of Shijiazhuang Railway Institute