期刊文献+

加工能力受扰的可控排序干扰管理 被引量:7

Disruption Management in Scheduling with Controllable and Disrupted Processing Capability
下载PDF
导出
摘要 在加工时间可控的单机排序中,面对随机发生的干扰事件,研究了初始加工时间表的制定问题。对于干扰事件造成的影响采用匹配时间排序的应对策略,在干扰事件发生后,通过压缩工件加工时间,使新时间表在某时间点后完全恢复到初始加工时间表。基于工件吸收干扰事件影响的能力,设计复合排序规则来决定工件的优先级。由于问题内在的复杂性,在复合排序规则中,应用遗传算法来确定某给定待处理工件集的最优参数。使用概率分布表示干扰事件的发生时刻和持续时间,并综合概率信息和工件的优先级来制定初始加工时间表。最后,通过随机数值试验模拟,发现本文设计的初始时间表优于根据最短加工时间优先规则制定的初始时间表,验证了方法对于处理干扰事件影响的有效性。 Facing random disruptions in single machine scheduling problem with controllable processing times, we study how to generate an initial schedule. The match-up scheduling policy is adopted to deal with the impact of disruptive events. During execution period after disruptions occurs, by compressing some jobs' processing times, we revise the initial schedule and make it consistent with the initial schedule at match-up time points. Based on job's capability to absorb disruptions, we design a composite dispatching rule to determine each job's priority. Due to inherent complexities, a heuristic is used to decide the optimal parameters for given job set in composite rule. We determine initial schedule based on jobs' priority and the probabilistic information of disruptions. Through randomly generated numerical experiments, we show that the proposed approach outperforms the SPT schedule, and it can be an effective tool against disruptions.
出处 《系统管理学报》 CSSCI 2013年第4期505-512,共8页 Journal of Systems & Management
基金 国家自然科学基金资助项目(71271039 70902033 70801008) 大连理工大学重大项目培育课题(DUT12ZD208)
关键词 排序 可控加工时间 干扰管理 匹配时间点 scheduling controllable processing time disruption management match-up time point
  • 相关文献

参考文献18

  • 1Mehta S V, Uzsoy R M. Predictable scheduling of a job shop subject to breakdowns [ J ]. IEEE Transactions on Robotics and Automation, 1998, 14 (3). 365-378.
  • 2唐国春.关于Scheduling中文译名的注记[J].系统管理学报,2010,19(6):713-716. 被引量:5
  • 3Inman R A, Sale R S, Green K W, et al. Agile manufacturing : Relation to JIT, operational performance and firm performance[J]. Journal of Operations Management, 2011, 29(4): 343-355.
  • 4Lee C Y, Yu G. Single machine scheduling under potential disruption[J]. Operations Research Letters, 2007, 35(4): 541 -548.
  • 5Wang J J, Wang J B, Liu F. Parallel machines scheduling with a deteriorating maintenance activity [J]. Journal of the Operational Research Society, 2011, 62(10) : 1898-1902.
  • 6Hall N G, Potts C N. Rescheduling for job unavailahility[J]. Operations Research, 2010, 58 (3) : 746-755.
  • 7Yang B, Geunes J. Predictive reactive scheduling on a single resource with uncertain future jobs [J]. European Journal of Operational Research, 2008, 189 (3): 1267-1283.
  • 8胡祥培,孙丽君,王雅楠.物流配送系统干扰管理模型研究[J].管理科学学报,2011,14(1):50-60. 被引量:39
  • 9Liu L, Gu H Y, Xi Y G. Robust and stable scheduling of a single machine with random machine breakdowns [J]. International Journal of Advanced Manufacturing Technology, 2007, 31 ( 7-8 ) : 645- 654.
  • 10Al Hinai N, Elmekkawy T Y. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm [J]. International Journal of Production Economics, 2011, 132(2), 279-291.

二级参考文献54

  • 1王明春,高成修,曾永廷.VRPTW的扰动恢复及其TABUSEARCH算法[J].数学杂志,2006,26(2):231-236. 被引量:24
  • 2孙丽君,胡祥培,王征.车辆路径规划问题及其求解方法研究进展[J].系统工程,2006,24(11):31-37. 被引量:46
  • 3胡祥培,丁秋雷,张漪,王旭坪.干扰管理研究评述[J].管理科学,2007,20(2):2-8. 被引量:41
  • 4Teodorovid D, Pavkovic G. The fuzzy set theory approach to the vehicle routing problem when demand at nodes is uncertain [J]. Fuzzy Set and Systems. 1996, 82(3) : 307 -317.
  • 5Ioannou G, Kritikos M, Prastacos G. A problem generator-solver heuristic for vehicle routing with soft time windows[ J]. Omega, 2003, 31(1) : 41 -53.
  • 6Chiang W-C, Russell R A. A metaheuristic for the vehicle-routeing problem with soft time window [ J ]. Journal of the Operational Research Society, 2004, 55 : 1298 - 1310.
  • 7Yu G, Qi X. Disruption Management: Framework, Models and Applications [ M ]. Singapore: World Scientific Publishing Co. Pte. Ltd, 2004.
  • 8Wu C-L. Inherent delays and operational reliability of airline schedules [ J ]. Journal of Air Transport Management, 2005, 11 (4) : 273 -282.
  • 9Qi X, Bard J F, Yu G. Supply chain coordination with demand disruption[J]. Omega, 2004, 32(4) : 301 -312.
  • 10Zhu Z, Bard J F, Yu G. Disruption management for resource-constrained project scheduling[ J]. Journal of the Operational Research Society, 2005, 56(4): 365-381.

共引文献46

同被引文献112

引证文献7

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部