期刊文献+

膨胀性辉绿岩隧道修建主要工程问题及对策分析 被引量:3

Difficulties in Construction of Tunnels in Swelling Diabase and Their Countermeasures
下载PDF
导出
摘要 为分析在建高速公路某隧道出口膨胀性辉绿岩地段台阶法施工过程中的主要工程问题,并提出相应对策。通过现场监测数据和理论计算分析,研究了膨胀性辉绿岩隧道在施工期间的主要工程问题,分析表明:全风化至强风化辉绿岩亲水性矿物高岭石含量高、吸水膨胀、失水收缩、易崩解、易扰动及岩体裂隙发育等工程特性会给穿过该地层的隧道带来初期支护受力不均、喷射混凝土出现开裂剥落、易失稳破坏、洞室及地表严重变形、塌方频繁的工程问题;解决上述工程问题的关键措施是控制初期支护变形,做好排水,减少膨胀性辉绿岩与水的接触。 A tunnel passes through completely-weathered-to-intensely-weathered diabase, which is a kind of swelling rock mass. The difficulties in the construction of the tunnel located in the swelling diabase are studied by means of site monitoring and theoretical calculation. Conclusions drawn are as follows: 1 ) The weathered swelling diabase has such properties as containing a large amount of kaolinite, swelling when water is absorbed, shrinking when water is lost and being subject to spalling; 2 ) The tunneling may encounter such difficulties as uneven stress on the primary support, spalling of the primary shotcrete, serious deformation, failure and collapse; 3 ) Countermeasures to overcome above- mentioned difficulties include controlling the deformation of the primary support, keeping good drainage conditions and preventing the diabase from contacting water.
作者 蔡晖
出处 《隧道建设》 2013年第7期597-601,共5页 Tunnel Construction
关键词 隧道 全风化至强风化辉绿岩 膨胀围岩 台阶法 初期支护变形 初期支护混凝土剥落 塌方 tunnel completely-weathered-to-intensely-weathered diabase swelling rock mass bench cut method pri-mary support deformation spalling collapse
  • 相关文献

参考文献7

二级参考文献45

共引文献281

同被引文献25

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部