期刊文献+

轨道交通枢纽检票设备能力分析 被引量:1

Capacity Analysis of Fare Collection System at Rail Transit Hub Station
下载PDF
导出
摘要 检票设备作为轨道交通枢纽的核心客服设备,其能力大小是轨道交通枢纽站设计、管理和组织的基础。合理确定检票设备能力和配置数量对节约轨道交通枢纽运营成本和提高客运服务质量具有重要的现实意义。通过对北京南枢纽站实地调研,对不同属性旅客检票时间运用χ2检验与t检验相结合的方法,确定不同属性旅客检票时间分布规律,进而分析轨道交通枢纽检票设备能力,并给出不同属性旅客通过检票设备能力的建议范围和计算公式。 Fare collection system is a critical facility at rail transit hub station. Reasonable ticket checking capacity is the core in rail transit hub design, management and organi- zation, it is also very important to decide the capacity of ticket checking equipment and the installation number in order to save the cost of railway operation and improve of the service level. Based on a spot investigation of Beijing South Rail Transit Hub, X^2-test and t-test are combined to determine the time distribution of ticket checking for dif-ferent passengers at the rail transport hub, the statistics are used to analyze the capacity of fare collection system, in order to give suggestions for ticket check device capabilities scope and calculation formula.
出处 《城市轨道交通研究》 北大核心 2013年第8期75-80,85,共7页 Urban Mass Transit
基金 国家自然科学基金资助项目(61004105) 国家科技支撑计划项目(2011BAG01B01) 教育部高等学校基本科研业务费(2011JBM159)
关键词 轨道交通枢纽 检票设备能力 Χ^2检验 T检验 能力 rail transport hub ticket checking equipmentcapacity X^2-test t-test capacity
  • 相关文献

参考文献8

二级参考文献26

共引文献1126

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部