期刊文献+

葛铺矿14-1103综采面老顶来压步距预测及实践 被引量:1

Prediction and Practice of First Weighting Interval of Main Roof at 14-1103 Fully Mechanized Face in Gepu Colliery
下载PDF
导出
摘要 针对正利煤业公司葛铺煤矿14-1103综采工作面煤层赋存情况,对14-1103综采工作面老顶的初次来压步距和周期来压步距进行了分析计算,根据结果对顶板采取了有效管理措施,实测结果与计算结果较吻合,为其它工作面提供了借鉴。 Aiming at seam occurrence of 14-1103 fully mechanized face, Gepu Colliery, Zhengli Coal Industry Co. , the author analyzes and calculates the first weighting interval and periodic weighting interval of main roof at 14-1103 fully mechanized face, and takes effective management measures on roof management according to the results (which are in agreement with the calculated results and provide references for other working faces. )
作者 王金龙
出处 《江西煤炭科技》 2013年第3期103-105,共3页 Jiangxi Coal Science & Technology
关键词 初采初放 初次来压 老顶垮落 primary recovery and initial blasting down the roof first weighting main roof collapse
  • 相关文献

参考文献4

二级参考文献5

共引文献42

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部