期刊文献+

某铀矿应用横撑支柱留矿法的探讨 被引量:1

Feasibility study of application of stulled shrinkage stoping in a uranium mine
下载PDF
导出
摘要 某铀矿对于围岩不稳固、急倾斜薄矿体主要采用浅孔留矿法进行回采。该采矿法回采安全性差,贫化率高,经济效果差。若采用横撑支柱留矿法回采,将会有效地解决上述问题。 Due to its own production limitation, normal shallow hole shrinkage stoping was used to mine steep thin ore bodies with unstable surrounding rock in a uranium mine. The method brought about low mining safety eoeffcient,high dilution rate and poor economic effect during mining. The feasibility of adopting the stulled shrinkage stoping to mine the ore bodies are studied, and the stulled shrinkage stoping is compared with the shallow hole shrinkage stoping. It is considered that the above problems can be solved by using the stulled shrinkage stoping.
作者 李从飞
出处 《铀矿冶》 CAS 2013年第3期113-115,共3页 Uranium Mining and Metallurgy
关键词 铀矿 不稳固围岩 急倾斜薄矿体 横撑支柱留矿法 uranium mine unstable rock steep thin body stulled shrinkage stoping
  • 相关文献

参考文献1

  • 1李富平,吕广忠,朱明.采矿知识500问[M].北京:冶金工业出版社;2010:9.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部