摘要
本文简介了江南新苑项目设计、施工中存在的问题和不足,就具体的实施过程提出了针对性的对策,通过各专业有机协同工作,取得了良好的设计效果,获得了很好的评价。
This paper introduces existing problems and deficiencies in design and construction of South New Garden project,it proposes countermeasures in concrete process implementation, through the professional organic cooperative work, has achieved good effect of design, get a good evaluation.
出处
《城市建筑》
2013年第8期29-30,共2页
Urbanism and Architecture
关键词
小区
规划
对策
district
planning
countermeasures