摘要
结构整体分析时嵌固端的确定、地基基础设计中的差异沉降控制、超长地下室的防开裂措施是大底盘多塔高层设计中的关键性技术问题。本文主要探讨了大底盘多塔地下室的差异沉降协调技术。
The determination of embedded solid end when overall analysis of the structure, the differential settlement control of the foundation design and the anti-cracking measures of the long basement are the key technical problems in high-rise design of the large chassis multi-tower. This article mainly discusses the differential settlement coordination technology of the large chassis multi-tower basement.
出处
《城市建筑》
2013年第8期273-274,共2页
Urbanism and Architecture
关键词
大底盘
多塔地下室
差异沉降
协调技术
large chassis
multi-tower basement
differential settlement
coordination technology