摘要
以广州太古汇项目为例,探讨实现综合效益最优化的绿色建筑必须基于全过程设计管理;建筑师是绿色建筑设计的统领者;重视团队协同的过程控制;以及选择适宜的设计方法是全过程设计管理在绿色建筑实现过程中的关键。
This paper takes Taikoohui as an example and argues that it is necessary to focus on design management of whole process to optimize the comprehensive benefit of sustainable building. The Architect should be the coordinator, as far as process control of team collaboration and feasible design approach are the pivotal issues of the whole process design management of green building achievement.
出处
《南方建筑》
2013年第3期69-72,共4页
South Architecture
关键词
绿色建筑
项目全过程设计管理
设计模式
太古汇
green building
comprehensive process design management
design approach
Taikoohuii