当建筑物结构设计根据具体情况不设置永久变形缝时,施工后浇带是解决施工阶段的差异沉降的重要方式,由于施工周期长,应重视其施工质量问题和处置方式。
When the building structure design according to the specific situation of not setting the permanent deformation joints, conslruction post-pouring belt is an important way to solve differential settlement in the construction stage, because of lo- ng construction period, we should pay more attention to its co- nstruction quality problems and treatment.
出处
《城市建筑》
2013年第14期100-101,共2页
Urbanism and Architecture
关键词
后浇带
质量处置
施工要求
post-pouting belt, quality management, construction requirements