层状围岩隧道变形控制技术探讨与实践 被引量:4

Discussion and Practice on Large Deformation Control Technology of Tunnel in Layered Rock
下载PDF
导出
摘要 根据兰渝铁路薄层板岩隧道的工程实践,在分析层状围岩大变形机理的基础上,研究采用微台阶仰拱快速施工法、单工序作业仰拱快速封闭法等控制围岩变形。分析表明,减小围岩变形总量主要有降低变形速率和快速封闭仰拱以缩短变形时间两种途径。微台阶仰拱快速施工法,下台阶与仰拱同步推进,缩短了初期支护封闭成环时间进而减小围岩变形持续发展。单工序作业仰拱快速封闭法采用边墙长锚杆降低围岩变形速率,采用铣挖机减小爆破对周边围岩和初支段的扰动,围岩变形控制效果好。 Based on the engineering practice of Lanzhou-Chongqing railway tunnel with thin layer slate and analysis of lay- ered surrounding rock large deformation mechanism, study is carried out on the micro-step inverted arch fast construction method, the single working procedure inverted fast closing method to control the surrounding rock deformation. The Re- search shows that there are mainly two kinds of ways to reduce the deformation of surrounding rock : one is to reduce the to- tal deformation rate, and the other way is to shorten deformation time by fast closing inverted arch. Micro step inverted fast construction method, synchronous heading of bench excavation and inverted can shorten the initial support closed loop time and reduce the sustainable development of surrounding rock deformation. The single working procedure of inverted arch rap- id closure method makes use of side wall long anchor to reduce surrounding rock deformation rate, and the milling machine is adopted to alleviate the disturbance of blasting on the surrounding rock and initial support, which effectively controls the surrounding rock deformation.
作者 王更峰
出处 《铁道建筑技术》 2013年第7期28-31,共4页 Railway Construction Technology
基金 极高地应力状态下软岩隧道大变形控制及快速施工关键技术研究(编号:11-04B)
关键词 隧道层状围岩 变形机理 变形控制技术 layered rock tunnel deformation mechanism deformation control technology
  • 相关文献

参考文献4

二级参考文献21

共引文献43

同被引文献26

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部