6[5]Tang L X,Liu J Y,Rong A Y,et al.Modeling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules[J].International Journal of Production Research,2002,40(5):1583-1595.
7[6]Tang L X,Luh P B,Liu J Y,et al.Steel-making process scheduling using Lagrangian Relaxation[J].International Journal of Production Research,2002,40(1):55-70.
8[7]Tang L X,Liu J Y,Rong A Y,et al.A review of planning and scheduling systems and methods for integrated steel production[J].European Journal of Operational Research (Invited Review),2001,133(1):1-20.
9[8]Tang L X,Liu J Y,Rong A Y,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex[J].European Journal of Operational Research,2000,124 (2):267-282.
10GANG X T,NYBEEG R. Push/pull production plan and schedule used in modern refinery CIMS[J].Robotics and Computer Integrated Manufacturing,July 2000.