摘要
根据实际工作经验,总结了北京市建设项目水资源论证的特点,分析水资源论证工作目前存在的问题,提出了不同类型建设项目水资源论证工作的重点,为今后的水资源论证工作提供参考。
Massive works of water demonstration had been done since the regulation for assessment of water-draw and utilization in construction projects was issued.Based on practical working experience,the author summarized the characteristics of water resources demonstration in Beijing,and analyzed the problems at these works,additionally key points of different kinds of water demonstration were proposed as well.
出处
《北京水务》
2013年第4期4-7,共4页
Beijing Water
关键词
水资源论证
水源热泵
再生水
地下水
规划
water demonstration heat pump reclaimed water waterground planning