期刊文献+

建设项目中危险废物的管理探讨 被引量:2

Approach on Hazardous Waste Management in Construction Projects
下载PDF
导出
摘要 探索了建设项目中危险废物的管理措施,提出了提前介人的管理方法,即从环境影响评价阶段起,就对建设项目将产生的危险废物纳入管理轨道。这使危险废物管理的控制关口前移,完善了危险废物全过程管理的内涵。 Several pieces of experience in the field of hazardous waste management for construction projects have been introduced. The Pre-participation Management for Hazardous Waste (PPMHW) was proposed according to the regulations concerned. The PPMHW brought into four periods of construction projects management starting from environmental impact assessment (EIA), trial-running, putting into production and regular-running. It introduced a way to extend the scope of hazardous waste management of the EIA- and trial-running of construction projects, thus improved the 'Cradle-to-Grave'management of hazardous waste and gave it new meaning.
出处 《上海环境科学》 CAS CSSCI CSCD 2000年第12期560-561,共2页 Shanghai Environmental Sciences
关键词 建设项目 危险废物 环境影响评价 全过程管理 Construction projects Hazardous waste Environmental impact assessment Pre-participation 'Cradle-to-Grave' management
  • 相关文献

同被引文献13

引证文献2

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部