摘要
基于水资源日益紧张的现状,对我国城镇污水处理厂设备的调试与试运行进行了分析,并从溶解氧、BOD负荷以及污泥龄三方面对AAO工艺试运行管理进行了论述,以满足城镇居民对水资源二次利用或多次利用的需求。
Based on water source shortage status,the paper analyzes the equipment adjustment and trial operation of domestic town sewage plant,and discusses AAO technology operation management from three aspects of dissolved oxygen,BOD load and sludge age,with a view to meet secondary water source utilization and multiple usages.
出处
《山西建筑》
2013年第22期129-130,共2页
Shanxi Architecture
关键词
污水处理厂
设备调试
试运行分析
水资源
sewage plant
equipment adjustment
trial operation analysis
water source