摘要
以忻保高速公路施工为例,介绍了预制箱梁安装的准备工作,从支座的安放、移梁、架设等方面阐述了具体的施工方案,归纳总结了施工过程中的安全操作要点,以确保工程质量及安全。
Taking Xin-Bao highway construction as an example,this paper introduced the preparing work of prefabricated box beam installation,elaborated the specific construction scheme from support position,beam moving,erection and other aspects,summarized the safety operation key points in construction process,to ensure the engineering quality and safety.
出处
《山西建筑》
2013年第22期175-176,共2页
Shanxi Architecture
关键词
预制箱梁
支座
架设
安全
prefabricated box beam
support
erection
safety