摘要
从项目建设全过程管理角度,分析了设计、招投标、施工安装及调试等阶段影响暖通空调系统联合调试的因素,包括设备选型、专业配合、标段划分等,提出了保证调试质量的建议。
From the point of the whole process of construction project management,analyses the influence factors in design,tendering,installation and commissioning stages on joint commissioning of HVAC system,including equipment selection,interdisciplinary coordination and bid-section,and proposes recommendations to ensure the quality of commissioning.
出处
《暖通空调》
北大核心
2013年第7期65-67,共3页
Heating Ventilating & Air Conditioning
关键词
暖通空调
设计
招投标
施工
调试
管理
HVAC
design
tendering
construction
commissioning
management