摘要
天津团泊新城国际网球中心一期工程为圆形建筑,外立面主体为钢结构且为倾斜状。经过探讨、试验、对比分析,最后选择PC百叶板的可调连接装置代替传统幕墙施工工艺。介绍了PC百叶板可调连接装置的技术特点、适用范围、工艺原理、操作要点,详细介绍了PC百叶板幕墙的安装工艺,总结了PC百叶板可调连接装置的施工关键技术和创新点以及主要质量控制措施。实践证明,该技术施工工艺简单,现场可操作性强,节约材料,为绿色施工提供了技术保障。
Phase I of Tuanbo Xincheng International Tennis Center in Tianjin is round shape,its facades is inclined steel structure.Adjustable connecting system is adopted for the PC louver wall instead of tradition curtain wall after discussion,tests,comparing and analysis.The technical features,applicable range,principle and operation keys of the adjustable connecting system are introduced,as well as installation technology of PC louver wall.The key construction methods,innovation and quality control measures of the adjustable connecting system for PC louver wall are summarized.It proves that the construction technology is simple with good operational capability,and it can save materials to provide technical support for green construction.
出处
《施工技术》
CAS
北大核心
2013年第15期61-63,共3页
Construction Technology
关键词
幕墙
PC百叶板
施工技术
绿色施工
curtain walls
PC louver walls
construction
green construction