摘要
主要针对大型双壁钢围堰浮运下沉就位困难的问题,提出了采用墩位筑岛下沉安装就位的解决方法,并对具体的施工工艺进行了详细介绍,为大型双壁钢围堰安装就位施工提供了新思路。
Mainly in view of the difficult problems of large double wall steel cofferdam floating clouds sinking in place, this paper proposed the so- lutions using piers island sinking in place installation, and introdueed in detail the specific construction process, provided new way for large doub- le wall steel cofferdam installation in place construction.
出处
《山西建筑》
2013年第26期158-160,共3页
Shanxi Architecture
关键词
大型双壁钢围堰
筑岛
下沉就位
large double wall steel cofferdam, island, sinking in place