摘要
目前我国各大城市都处于高速发展期,其间一些城市轨道交通工程可行性研究(简称"工可研")阶段所必需的、理应稳定的基础资料和设计依据也在随着城市的发展不断变化。通过对南京地铁1号线南延线工可研项目的案例分析,论述在工可研阶段如何很好地处理本工程项目与城市总体规划、城市轨道交通线网规划和城市轨道交通建设规划之间的关系。
At present, large cities in China are experiencing a high-speed development period. At the same time, some basic data and design information requred for engineering feasibility study of urban rail transit projects are also changing. The author analysed the engineering feasibility study of Nanjing rail transit extended south line and discussed how to handle the relations among the engineering project, city overall planning, network planning and construction planning of urban rail transit.