摘要 为分析拦挡坝对尾矿坝溃决泥沙的拦截效果,以云南某在建尾矿库为工程背景,依据相似理论,并运用尾矿坝溃决模型试验装置,深入分析拦挡坝设防高度对尾矿坝溃决泥沙拦截效应。研究结果表明:拦挡坝高度决定了其对泥沙的拦挡效果,它是所拦挡泥沙的量的决定性因素,它决定了拦挡坝的库容,直接影响着冲向下游的泥沙量;随着设防高度的增加,尾矿库溃决泥沙到达库区同一特征过流断面处的最大淹没高度逐渐降低,泥沙到达下游同一过流断面处的时间也逐渐延后,泥沙对下游构筑物的冲击力呈逐渐减小趋势;泥深峰值及冲击力峰值与设防高度之间基本呈线性关系。 To study the buffering effect of a check dam on debris flow surging from tailings dam-break, a tailings pond under construction in Yunnan province was taken as a case. Flow characteristics of debris flow surging from tailings dam-break after adding a check dam were studied and experimentally using a tailings dam-break flume, and the corresponding preparedness of disaster prevention and reduction was put forward. The preliminary results show that:the buffering effect is determined by the height of the check dam, that with the height of the check dam increasing, the slurry height and the impact force at same cross section are gradually decreased, the time needed for the slurry arrives at the same cross section is gradually delayed, and that the relation between the height and the impact force peak is a roughly linear one.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2013年第6期98-102,共5页 China Safety Science Journal
基金 国家自然科学基金资助(51104176) 重庆市教育委员会科学技术研究项目(KJ131408) 重庆科技学院校内科研基金资助(CK2011B30) 重庆科技学院安全风险与控制团队基金资助 高等学校博士学科点专项科研基金博导类资助课题(20110191110001)
关键词 尾矿坝 溃坝 拦挡坝 缓冲效应 模型试验 tailings dam dam-break check dam buffering effect model test
  • 相关文献

参考文献15

二级参考文献62

共引文献226

同被引文献37

  • 1尹光志,魏作安,万玲,张东明.细粒尾矿堆坝加筋加固模型试验研究[J].岩石力学与工程学报,2005,24(6):1030-1034. 被引量:32
  • 2何友芳,尹光志,张东明.土工格栅与铜矿尾矿界面作用特性的实验研究[J].重庆建筑大学学报,2006,28(2):86-88. 被引量:8
  • 3赵健.我国泥石流防治措施研究[J].中国水利,2007(14):50-52. 被引量:30
  • 4KEMPER T, SOMMER S. Estimate of heavy metal contamination in soils after a mining accident using reflectance spec- troscopy[J] .Environmental Science and Technology, 2002, 36(12) :2 742-2 747.
  • 5MARCUS W A, MEYER G A, NIMMO D R. Geomorphic control of persistent mine impacts in a Yellowstone Park stream and implications for the recovery of fluvial systems[J]. Geology,2001,29(4) :355-358.
  • 6FOURIE A B, BLIGHT G E, PAPAGEORGIOU G. Static liquefaction as apossible explanation for the merrie spruit tail- ings dam failure E J]. Canadian Geotechnical Journal, 2001,37 (4) : 707-719.
  • 7HARDER L F J, STEWART J P. Failure of Tapo-Canyon tailings dam[J].Journal of Performance of Constructed Facili- ties, 1996,10(3) :109-114.
  • 8BLIGHT G E. Destructive mudflows as a consequence of tailings dyke failures[J].Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 1997,125 ( 1 ) : 9-18.
  • 9CHANDLER R J, TOSATTI G. Thestava tailings dams failure, Italy, July 1985[J].Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 1995,113(2) :67-79.
  • 10VICK S G. Tailings dam failure at Omai in Guyanal-J3.Mining Engineering, 1996,48( 11):34-37.

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部