摘要
目的:降低我院药房断药频率。方法:按照品管圈理论的十大步骤实施各项活动,分析造成断药的原因,探讨解决对策并实施,评价有形成果(药房断药频率)和无形成果(圈能力),制订标准化流程。结果:药房断药的主要原因有出库不及时、临床退药不及时、入库登记不及时、药品随货同行单不合格等。针对以上原因,采取制订并实施相关规范如药品采购与入库规范、核对药品流程规范、细化工作流程、制订特殊关注药品目录等对策。活动后药房断药频率由3.77%降低至0.93%;圈员在品管圈手法、责任感、沟通与协调等方面有较大幅度的提高。结论:品管圈活动的开展对降低我院药房断药频率是可行的,建议推广应用。
OBJECTIVE: To reduce the rate of drug supply interruption in our hospital. METHODS: Activities were implement- ed according to the ten steps of quality control circle (QCC), and the reasons for drug supply interruption were analyzed to investi- gate and implement countermeasures. Visible achievements (the rate of drug supply interruption) and invisible achievements (the ef- fect of QCC) were evaluated, and standardization process was formulated. RESULTS: The main reasons for drug supply interrup- tion included delayed outbound, delayed clinical drug withdraw, delayed storage registration and unqualified packing list with prod- ucts, etc. The countermeasures were formulated and implemented, i.g. relevant standards for drug purchase and storage, drug check- ing process, workflow refinement, special drug list, etc. The rate of drug supply interruption was reduced from 3.77% to 0.93%. Members had great improvement in QCC methods, the sense of responsibility, communication and coordination. CONCLUSIONS: The implementation of QCC is feasible for the reduction of the rate of drug supply interruption in our hospital, and should be ap- plied and spread.
出处
《中国药房》
CAS
CSCD
2013年第33期3119-3122,共4页
China Pharmacy
关键词
品管圈
断药频率
有形成果
无形成果
Quality control circle
Rate of drug supply interruption
Visible achievements
Invisible achievements