期刊文献+

带有准备时间的可拒绝供应链排序

Supply Chain Scheduling with Setup Time and Rejection
下载PDF
导出
摘要 考虑可拒绝排序中生产与配送的集成问题.有一个制造商和多个客户,不同的客户订购不同种类的工件.机器在加工不同种类的工件前要有一个准备时间.对于客户的工件制造商可以选择接受或拒绝加工,但当工件被拒绝时制造商需要支付相应的拒绝费用.每个工件有自己的工期并且生产完成后需要配送到相应的客户处,每一批配送需要花费一定的时间和费用.该文研究了排序理论中几个主要的目标函数,给出了相应的动态规划算法并分析了算法的复杂性. This paper considered multiple customers’supply chain scheduling problems with the coordination of production and distribution.There are one manufacturer and several customers.Different customers order different jobs.A setup time is incurred before the machine processes a new family of jobs.The manufacturer can accept or reject jobs,but the rejection penalty has to be paid once they reject jobs.Processed jobs are delivered in batches to their respective customers.Each job has a due date and each shipment incurs a delivery cost and a delivery time.We studied several main objective functions and gave a dynamic programming algorithm for these problems and analyzed the algorithm’s complexity.
出处 《曲阜师范大学学报(自然科学版)》 CAS 2013年第3期7-11,共5页 Journal of Qufu Normal University(Natural Science)
基金 国家自然科学基金(11071142)
关键词 供应链排序 准备时间 拒绝费用 动态规划 supply chain scheduling setup time rejection penalty dynamic programming
  • 相关文献

参考文献9

  • 1Hall N G, Potts C N. Supply chain scheduling:Batching and delivery[ J]. Operations Research,2003,51:566-583.
  • 2Chen Z L, Variraktarakis G L. Integrated scheduling of production and distribution operations [ J ]. Management Science,2005,51 : 614-628.
  • 3Chen Z L. Integrated production and outbound distribution scheduling: review and extensions [ J ]. Operations Research,2010,58: 130-148.
  • 4Cheng T C E, Wang X L. Machine scheduling with job class setup and delivery considerations [ J ]. Computers and Operations Re- search,2010,37 : 1123-1128.
  • 5Wang X L, Cheng T C E. Heuristic for parallel machine scheduling with job class setups and delivery to multiple customers [ J ]. International Journal of Production Economies,2009,119 : 199-206.
  • 6王磊,张玉忠,王国庆.带交货期的工件族生产与配送的排序问题[J].运筹与管理,2011,20(3):77-80. 被引量:8
  • 7Bartal Y, Leonardi S, Spaccamela M A. Muhiprocessor scheduling with rejection [ J ]. SIAM Journal on Discrete Mathematics, 2000,13:64-78.
  • 8Engels D W, Karger D R, Kolliopoulos S G. Techniques for scheduling with rejection [ J ]. Journal of Algorithms, 2003,49: 175- 191.
  • 9Sengupta S. Algorithms and approximation schemes for minimum lateness/tardiness scheduling with rejection [ J ]. Leeture Notes in Computer Science ,2003,2748:79-90.

二级参考文献7

  • 1Hall N G, Potts C N. Supply chain scheduling: batching and delivery[J]. Operations Research, 2003, 51: 566-583.
  • 2Chen Z L, Variraktarakis G L. Integrated scheduling of production and distribution operations [ J]. Management Science, 2005, 51 : 614-628.
  • 3Chen B, Lee C Y. Logistics scheduling with batching and transportation [ J]. European Journal of Operational Research, 2008, 189: 871-876.
  • 4Chen Z L. Integrated production and outbound distribution scheduling: review and extensions[ J]. Operations Research, 2010, 58: 130-148.
  • 5Cheng T C E, Wang X L. Machine scheduling with job class setup and delivery considerations[ J]. Computers and Operations Research, 2010, 37: 1123-1128.
  • 6Wang X L, Cheng T C E. Heuristic for parallel-machine scheduling with job class setups and delivery to multiple customers [ J]. International Journal of Production Economics, 2009, 119 : 199-206.
  • 7Pinedo M. Scheduling: theory, algorithm, and systems[M]. 2nd ed. Upper Saddle River, NJ: Prentice-Hall; 2002.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部