摘要
本文针对南方山前带B区某三维地震数据,采用自主研发的iCuster地震成像系统,将偏移速度分析、沿层统计速度分析和剩余速度分析相结合,通过递进式的建模技术流程提高了速度模型的精度,改善了叠前时间偏移成像质量。
According to the characteristics of 3D seismic data in the Area B of a foothill belt in the Southern China,in the paper we use progressive velocity model building technique,combining migration velocity analysis with horizon-based statistics velocity analysis and residual velocity analysis from self-developed iCluster,a seismic imaging system,to improve the accuracy of the velocity model. This approach finally leads to an improvement of the prestack time migration image.
出处
《石油地球物理勘探》
EI
CSCD
北大核心
2013年第4期526-530,676+500,共5页
Oil Geophysical Prospecting
关键词
山前带
速度建模
沿层统计速度分析
剩余速度分析
偏移成像
foothill belt,velocity model building,horizon-based statistics velocity analysis,residual velocity analysis,migration imaging