摘要
对5 MW风力发电机的试验架进行有限元分析和各方面性能模拟分析。分析结果表明,有限元法大大减少了设计周期,提高了设计的可靠性。
Finite element analysis and function simulated is made for 5MW wind generator test-bed. The ,results show that design cycle is shortened and the reliability is improved.
出处
《船电技术》
2013年第8期54-55,60,共3页
Marine Electric & Electronic Engineering
关键词
风电发电机试验架
有限元
力学分析
wind generator test-be
Finite element analysis
dynamics analysis