摘要
本文针对黄土塬山地三维测量施工中存在的大量炮点偏移、桩号难以确定等问题进行了深入的研究,探讨并提出了确定激发点偏移桩号的新方法、新思路,解决了施工现场偏移点桩号的问题,提高了施工质量及效率。
This paper analyzed problems occurred in Loess Tableland 3D surveying project, such as a larger number of shot migration and unsure pile number. Then the paper brought out some new ideas and new method to determine the shooting point and the offset point pile number exactly. The practical application proved that the operation quali- ty and efficiency can be improved by the new method.
出处
《物探装备》
2013年第4期262-264,共3页
Equipment for Geophysical Prospecting