摘要
对飞来峡水电厂机组一次调频短时间动作过于频繁、数据传输延时、频率测量误差影响考核结果进行原因分析,并提出应对措施。
The paper analyzes causes which affect the check results on unit of Feilaixia Hydropower Station,including over-frequent action in short-time during primary frequency modulation,data transmission delay,and frequency measurement error,as well as puts forward countermeasures against the above causes.
出处
《红水河》
2013年第4期67-71,共5页
Hongshui River
关键词
水轮发电机组
一次调频
飞来峡水电厂
water turbine-generator unit
primaryfrequencymodulation
Feilaixia hydropower station