3[1]Miller.D.K.,Lessons learned from the Northridge earthquake[J].Engineering Structures,1998,20(4-6):249-260.
4[2]Engelhardt,M.D,Sabol,T.A.Reinforcing of steel moment connections with cover plates:benefits and limitations[J].Engineering Structures,1998,20(4-6):510-520.
5[3]Chen,C.C.,Lu,C.A..Lin,C.C.Parametric study and design of rib-reinforced steel moment connections[J].Engineering Structures.2005,27(5):699-708.
6[4]Chen,C.C.,Chen,S.W.,Chung,M.D.,and Lin.M.C.Cyclic behaviour of unreinforeed and rib-reinforced moment connections[J].Journal of Constructional Steel Research,2005,61(1):1-21.
7[5]Chen,C.C.,Lin,C.C.,and Lin,C.H.Ductile moment connections used in steel column-tree moment-resisting frames[J].Journal of Constructional Steel Research,2006,62(8),793-801.
8[6]ANSYS,Swanson Analysis Systems,Inc.,2002.
9[8]FEMA.Recommended seismic design criteria for new steel moment-frame buildings[S].FEMA-350,Federal Emergency Management Agency,2000.
10[9]AISC.Seismic provisions for structural steel buildings[S].American Institute of Steel Construction,2005.