摘要
受上下游水工程拦蓄影响,河流流速变缓,水流的挟沙能力降低,对百色水文站泥沙测验影响极大。为此,通过对该站历年输沙率测验的情况分析,率定出稳定的历年综合单断沙关系线,经检验:其精度达到水文相关规范及水文巡测要求,可用来进行水文泥沙资料的整编。
Flow velocity decrease and silt carrying capacity of river drops due to influence of upstream and downstream hydraulic works, which renders great influence on sediment measurement at Baise Hydrological Station. Based on analysis of the sediment discharge measurement records over the years, stable comprehensive single-section sediment curve was calibrated. Results of examination demonstrate its accuracy conforms to requirements of specification and hydrological patrol metering. It can be used for compiling sediment data.
出处
《广西水利水电》
2013年第4期106-108,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水利工程
影响
输沙率
测验方式
调整
百色水文站
Hydraulic work
influence
sediment discharge
measurement method
adjustment
Baise Hydrological Station