某港堆场在地基处理施工的过程中,将设计与监测紧密结合,根据沉降监测的数据,进行动态设计,通过及时调整设计参数并优化地基处理设计方案,使场地残留沉降值始终能够控制在规范允许范围内,保证了堆场的正常使用。
In the process of ground improvement for a stacking yard in a cargo terminal, the designing process was closely integrated with the monitoring process, Based on the observed data of subsidence, dynamic designs were made to timely ad- just the design parameters and optimize the design of ground improvement, thus keeping the residual settlement within the al- lowable values defined in the specification and ensuring the normal use of the stacking yard.