水下振动沉管碎石桩施工密实度控制施工技术 被引量:2

Technology for Controlling Density of Vibration Driven Gravel Piles in Underwater Immersed Tubes
下载PDF
导出
摘要 温州状元岙围垦工程第三施工段促淤堤在地基处理过程中用水下振动沉管法进行碎石桩施工。通过调整拔管速度、充盈系数、留振时间等措施,利用重型动力触探对碎石桩进行检测,控制碎石桩密实度。工程实践表明,利用水下振动沉管法打设碎石桩对深层软基进行加固是可行的。 During the foundation treatment for building the siltation inducing dyke for the third phase of Zhuangyuanao Reclamation Project in Wenzhou, gravel piles were built by way of underwater vibration driving of immersed tubes. The den- sity of gravel piles were controlled by readjusting the extracting speed, fullness coefficients and stay-up time, and tested by heavy-duty dynamic penetration testing rigs. The engineering practice of the project showed that it is feasible to improve deep soft soils by way of gravel piles built by underwater vibration driven immersed tubes.
作者 路程
出处 《中国港湾建设》 2013年第4期72-75,共4页 China Harbour Engineering
关键词 水下沉管 碎石桩 拔管速度 充盈系数 重力触探 密实度 underwater immersed tube gravel pile extraction rate fullness coefficient dynamic penetration testing density
  • 相关文献

参考文献3

二级参考文献9

共引文献13

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部